Alexander Orr, Jr. Water Treatment Plant Rehabilitation and Replacement

Alexander Orr Water Treatment Plant

Alexander Orr, Jr. Water Treatment Plant Rehabilitation and Replacement

The Alexander Orr, Jr. Water Treatment Plant is Miami-Dade County’s largest potable water production facility. We provided operational improvement and regulatory-compliance consulting at the AOWTP and the South Water Supply System through a multiple-year, on-call contract. We partnered with operators and staff to identify next steps to get the most function from their infrastructure. Our assignments included:

  • Facility and condition assessment
  • Lime kiln renewal and component replacement
  • Value engineering/analysis study of the switchgear building expansion
  • Preliminary engineering of natural gas bypass reducing station and pipeline
  • Settling basin influent study
  • Design of engine driven high service pump replacement
  • Bench-scale testing and process optimization
  • Feasibility planning for operation and maintenance storage facilities
  • Preliminary engineering, design and construction phase services for various large diameter water mains

 

Alexander Orr Water Treatment Plant
Client
Miami-Dade Water and Sewer District
Location

Miami, FL
United States

Size
214.7 million gallons per day