Mike O'Callaghan - Pat Tillman Memorial Bridge (Hoover Dam Bypass)

Mike O'Callaghan - Pat Tillman Memorial Bridge (Hoover Dam Bypass)

Mike O'Callaghan - Pat Tillman Memorial Bridge (Hoover Dam Bypass)

The Central Federal Lands Highway Division of the Federal Highway Administration awarded us a contract to provide design and construction support services for the landmark Mike O'Callaghan - Pat Tillman Memorial Bridge. Under the management of CFLHD, we led an integrated team of professionals from HDR, T.Y. Lin International and Jacobs Engineering (formerly Sverdrup) which was collectively known as the Hoover Support Team. Several supporting specialty subconsultants completed the design team.

The work included design of roadway grading and paving, bridges, wildlife crossings, drainage, lighting, utilities, traffic management systems, pedestrian accommodations, interpretive exhibits, high-voltage transmission line relocations and a signature long-span bridge over the Colorado River. It also included geotechnical engineering, survey and mapping, and corridor architectural design.

HDR was responsible for designing the Nevada approach, including a high-level crossing of Gold Strike Canyon; two grade separations with existing U.S. 93; a grade separation with the Lower Portal Road; and the Nevada interchange with existing U.S 93, which will become the Hoover Dam access road. HDR subconsultant, Jacobs Engineering, designed the Arizona approach consisting of a major bridge near Sugarloaf Mountain and the Arizona interchange. The landmark river bridge, featuring the longest concrete arch in North America, was designed by a joint team led by T.Y. Lin with major support from HDR. The 3.5-mile corridor includes 1 mile of approach roadway in Arizona, 2.1 miles of roadway in Nevada and a nearly 1,900-foot-long crossing of the Colorado River approximately 1,500 feet downstream from the dam.

Explore Our Bridge Design Experience

Mike O'Callaghan - Pat Tillman Memorial Bridge (Hoover Dam Bypass)
Client
Central Federal Lands Highway Division of the Federal Highway Administration
Location

Boulder City, NV
United States

Size
The 3.5-mile corridor includes 1.2 miles of approach roadway in Arizona, 2.1 miles of roadway in Nevada and a 1,900-foot-long crossing of the Colorado River approximately 1,500 feet downstream of the dam.

Awards

Special Mention (2014)
fib Awards for Outstanding Concrete Structures
The International Federation for Structural Concrete (fib)
Award of Excellence (2013)
Major Civil Engineering Projects, Centenary Awards
International Federation of Consulting Engineers
Outstanding Civil Engineering Achievement Award (2012)
American Society of Civil Engineers
Grand Award (2011)
Engineering Excellence Awards
American Council of Engineering Companies of Nevada
Excellence in Structural Engineering Award (2011)
Bridges and Transportation Structures Category
Structural Engineers Association of Arizona
Bridge Award of Excellence (2011)
American Segmental Bridge Institute
Eugene C. Figg, Jr. Medal (2011)
International Bridge Conference
Be Inspired Award Winner (2011)
Innovation in Bridges Category
Bentley Be Inspired Awards
Outstanding Project (2011)
Bridges and Transportation Structures Category, Excellence in Structural Engineering Awards
National Council of Structural Engineers Associations
Grand Conceptor Award (2011)
Engineering Excellence Awards
American Council of Engineering Companies
First Place (2011)
Bridges (Projects > $100 Million) Category, Globe Awards
American Road & Transportation Builders Association
Project of the Year Award (2011)
Transportation (Greater than $75 Million)
American Public Works Association